04Many angles, many layers

Attention heads side by side, a classic network inside every layer, and layers stacked on top of each other.

Transformer pipelineTokens, vectors, attention, layers, next word; the stage covered in this chapter is highlighted.TokensCut the textVectorsMap of meaningAttentionUse contextLayersAttn + networkNext wordPredict↻ the predicted token is appended to the text and the cycle repeats

A single pass of attention is not enough to understand a sentence. Transformers repeat it in two ways: side by side, and on top of each other.

Side by side: attention heads

Within one layer, attention does not run once but several times in parallel, each run being called a "head". The original 2017 model had 8 heads per layer[5]; large modern models have dozens. Each head has its own learned way of forming queries, keys and values, so each ends up looking for something different. Researchers who examined trained models found heads that consistently link a pronoun to the noun it refers to, heads that simply look at the previous word, and heads that connect a verb to its object[11]. Nobody assigned these roles: they emerged during training because they help predict the next word. Many other heads do things that remain hard to describe.

Three attention headsThree heads starting from it link to trophy, because, and the verb.Head 1: what does "it" refer to?Thetrophydidn'tfitinthesuitcasebecauseitHead 2: the word just beforeThetrophydidn'tfitinthesuitcasebecauseitHead 3: the main verbThetrophydidn'tfitinthesuitcasebecauseitSame word, same layer, three heads looking for different things
Illustrative. Studies of trained models have found heads specialised in this way [11], but many heads remain hard to interpret.

After the heads have done their work, their findings are combined into a single update of each word's vector.

Between two attention steps: a classic network

Attention is only half of each layer. The other half will look familiar to anyone who has met neural networks before.

Classic network compared with a transformerEach transformer layer alternates attention with a classic network applied to each word.Classic networkFixed input, one passTransformerOne column per wordOutputInputnext wordNetworkNetworkNetworkNetworkNetworkNetworkAttentionAttentionIspeakFrench× many layersClassic neural networkAttention (new in transformers)
Within a layer, the "Network" boxes are one and the same network, with the same weights, applied to each word separately.

On top of each other: layers

The original model stacked 6 such layers; GPT-3, in 2020, had 96[14]. Each layer does not replace a word's vector but adds to it, a little like readers successively annotating the margins of the same page: the original word is never lost, and each layer contributes its refinements. Studies of trained models suggest a rough division of labour, with early layers handling surface features such as word pieces and grammar, middle layers building meaning, and the last layers preparing the prediction. It's a tendency rather than a strict rule, but it captures why depth matters: understanding is built up gradually.