Sources et lectures complémentaires
Numérotées dans l'ordre de leur première apparition dans cet article.
- McCulloch, W. S. and Pitts, W. (1943). A logical calculus of the ideas immanent in nervous activity. Bulletin of Mathematical Biophysics, 5, 115-133. https://doi.org/10.1007/BF02478259
- Rumelhart, D. E., Hinton, G. E. and Williams, R. J. (1986). Learning representations by back-propagating errors. Nature, 323, 533-536. https://doi.org/10.1038/323533a0
- Hochreiter, S. and Schmidhuber, J. (1997). Long short-term memory. Neural Computation, 9(8), 1735-1780. https://doi.org/10.1162/neco.1997.9.8.1735
- Bahdanau, D., Cho, K. and Bengio, Y. (2014). Neural machine translation by jointly learning to align and translate. https://arxiv.org/abs/1409.0473
- Vaswani, A. et al. (2017). Attention is all you need. https://arxiv.org/abs/1706.03762
- Rosenblatt, F. (1958). The perceptron: a probabilistic model for information storage and organisation in the brain. Psychological Review, 65(6), 386-408. https://doi.org/10.1037/h0042519
- Nair, V. and Hinton, G. E. (2010). Rectified linear units improve restricted Boltzmann machines. Proceedings of ICML 2010.
- Zeiler, M. D. and Fergus, R. (2014). Visualizing and understanding convolutional networks. https://arxiv.org/abs/1311.2901
- Krizhevsky, A., Sutskever, I. and Hinton, G. E. (2012). ImageNet classification with deep convolutional neural networks. NeurIPS 2012. https://papers.nips.cc/paper/2012/hash/c399862d3b9d6b76c8436e924a68c45b-Abstract.html